Erosion Control

Lock down the slope before the next storm finds it.

On a fresh-graded development site, bare soil is the single biggest liability. One real rain event and your sediment is in the neighbor's yard, the inspector is writing you up, and your topsoil — the expensive part — is halfway to the creek.

Erosion control isn't one product. It's a sequenced system: armor the places where concentrated water lands (rip rap), confine the slopes too steep to hold cover alone (geocell), build engineered walls where grade has to change in a short distance (segmental retaining walls), and lock the rest of the soil surface down fast with hydroseed and erosion blankets.

We install all four, in the right order, on residential developments, commercial pads, subdivisions, and post-grading sites. Permit-ready, NPDES-compliant, and built to actually work — not just check a box for the SWPPP binder.

Systems we install

Four erosion-control methods we install — and where each one belongs.

Not sure which one fits your property? That's our job. We walk the site with you, look at the soil and the slope, and recommend the system — or combination of systems — that actually solves the problem. No upsell, no guesswork.

Rip rap drainage installation

Rip rap

Best for: Channel bottoms, pond outfalls, culvert ends, high-velocity discharge

Angular granite stone — typically Class A, B, or 1 depending on flow — placed over a non-woven geotextile filter fabric. Dissipates the energy of moving water where it would otherwise scour soil out and undermine structures. We size the stone to the predicted velocity, not by eyeball.

Geocell stabilization drainage installation

Geocell stabilization

Best for: Slopes steeper than 2:1, channel linings, load-support over weak subgrade

Expandable HDPE honeycomb panels anchored to the slope and infilled with gravel, sand, or topsoil. The cells confine the fill so gravity and water can't pull it downhill. Lets us vegetate slopes that would otherwise need a wall or a much flatter grade.

Segmental retaining walls drainage installation

Segmental retaining walls

Best for: Permanent grade changes, terraced lots, road cuts, walkout basements

Engineered concrete-block walls with geogrid reinforcement extending back into the retained soil, drainage stone behind the block, and a compacted leveling pad below. Built to NCMA spec — walls past 4 ft get a stamped engineering design. They hold the grade for fifty years; they don't lean in five.

Hydroseeding drainage installation

Hydroseeding

Best for: Large bare slopes, finish stabilization, fast green cover for inspection

A pressure-sprayed slurry of seed, wood-fiber mulch, fertilizer, and tackifier laid down over freshly graded soil. Germinates faster and more evenly than dry seed, and the bonded mulch layer holds the surface together while roots establish. Add erosion-control blankets on the steeper runs.

Why it matters

What you get when it's done right.

Inspection-ready

NPDES / SWPPP-compliant install with photo documentation of every BMP we put in.

No washouts

Stone sized to flow, slopes confined where they need it, cover established before the next storm.

Engineered walls

Geogrid-reinforced segmental walls with stamped design past 4 ft — built to NCMA standards.

One crew, one schedule

Grade, armor, wall, and seed handled by us — no waiting on three subs to finish what the others started.

Our process

From first call to final walk-through.

  1. Step 01

    Site walk & plan review

    Walk the graded site with you, review the SWPPP or stormwater plan, flag the high-velocity points and the slopes that need confinement.

  2. Step 02

    Layout & stake

    Stake rip rap aprons, retaining wall alignments, and geocell zones. Confirm stone sizing, wall heights, and seed mix.

  3. Step 03

    Install in sequence

    Walls and structural work first, rip rap at outfalls, geocell on steep slopes, then hydroseed everything that's still bare.

  4. Step 04

    Verify & document

    Photo BMPs in place, walk the site with you and the inspector, hand over a clean punch list.